Owner's representative for building automation (BAMO)

Service Owner's representationFor Building owners · architectsSIA phases 11 to 62

The owner's representative — BAMO in French-speaking Switzerland — looks after the building owner's interests on the controls package. It turns operating needs into requirements, checks what contractors offer and then deliver, and makes sure the building handed over is tuned, documented and easy to operate.

In short

wall-i acts as an owner's representative specialised in building controls and BMS: neutral advice, clear decision structures, review of tender documents and bids, site supervision, acceptance testing and optimisation after the first season. No ties to any manufacturer or integrator; active in Valais and across French- and German-speaking Switzerland.

Why the controls package needs an owner's representative

Building controls sit where every technical package meets: heating, ventilation, cooling, electrical and IT. They are also the last trade on site, when deadlines are tightest. Their defects do not show at handover: they surface in operation, as excess consumption, ignored alarms or settings nobody dares to touch.

Few building owners have a controls specialist in-house. The owner's representative takes that role at their side: asking the right questions before the order, reading bids line by line and checking on site that what was promised actually works.

Our role, phase by phase

Our services follow the SIA 112 service model and the SIA 108 regulation.

SIA phaseWhat we doWhat you receive
11–21Objectives · preliminary studiesOperating requirements, survey of the existing installation, target efficiency class.BMS scoping note: scope, objectives, risks.
31Preliminary designControl concept, architecture options, cost estimate.Control concept and costed estimate.
32Detailed designSchematics, points lists, functional descriptions, KBOB naming.BMS design file, the basis for tendering.
41TenderBrand-neutral specification, bill of quantities, bid comparison.Comparison table and award recommendation.
51Execution designReview of the integrator's wiring diagrams and lists, coordination of HVAC, electrical and IT interfaces.Approved execution drawings, open questions closed.
52ConstructionSite supervision, meetings, checks on wiring and field device installation.Minutes and an up-to-date snag list.
53CommissioningDocumented functional tests, EDE file check, acceptance, operator training.Test records and as-built documentation.
61–62OperationOptimisation after the first season, energy monitoring, performance guarantee.Optimisation report and action plan.

What the building owner gains

Who it is for

Public and private building owners, owners of a property portfolio who want one naming convention and one supervision platform, and architects or HVAC design offices who want an independent controls specialist at their side. We work on new builds and renovations alike.

Owner's representation can be combined with our vendor-neutral tender service, or rely on documents prepared by another office.

Frequently asked questions

What does BAMO mean?

BAMO stands for bureau d'assistance au maître d'ouvrage, the term used in French-speaking Switzerland for the owner's representative or client adviser. France says AMO, and German-speaking Switzerland says Bauherrenunterstützung (BHU). In every case it is an agent who advises the building owner and defends their interests, with no ties to the contractors doing the work.

Does the owner's representative replace the HVAC designer or the integrator?

No. The HVAC design office designs the installations; the integrator supplies, programmes and commissions the control system. The owner's representative does none of that in their place: it sets the requirements, checks the deliverables and keeps the building owner informed so that decisions are made with full knowledge.

Can an owner's representative be appointed mid-project?

Yes. The role is most useful from the preliminary studies onwards, but we are also appointed along the way: reviewing tender documents before they are issued, comparing bids, checking execution drawings or carrying out acceptance tests.

Do you also work on existing buildings?

Yes. We analyse existing control installations, identify energy savings and draw up a renovation strategy compatible with ongoing operation.

wall-i SA · rue de l'Industrie 10 · 1950 Sion · hello@wall-i.ch

See also

Further reading

Contact

Need an independent view of your controls package?

Write to us hello@wall-i.ch We get back to you quickly.
Follow on LinkedIn