Vendor-neutral BMS tender: a specification open to every brand

Service Design · tenderingSIA phases 31 · 32 · 41Deliverable Tender file and bill of quantities

A vendor-neutral controls tender describes what the installation must do, not the product that must do it. Any integrator can bid with the hardware of its choice, and bids can be compared line by line.

In short

wall-i produces the control concept and the tender documents: schematics, points lists, functional descriptions, KBOB naming, communication requirements and bill of quantities. We then compare the bids and recommend an award. No brand is named, and wall-i does not bid on the tenders it writes.

What our tender file contains

What is most often missing from a controls tender

On site, we find the same gaps from one project to the next:

Why “vendor-neutral”

A specification that names a brand narrows competition to that brand's resellers. We describe operating needs before products, with functional criteria and open protocols: the market stays open to as many integrators as possible. The method is set out in the article Three brands, one supervision: writing an open specification.

This neutrality does not rest on a promise: wall-i SA is a separate company that sells neither hardware nor licences and does not bid on the tenders it writes.

From tender to award

We answer bidders' questions, check the bids line by line and give the building owner a comparison table and an award recommendation. Supervision can then continue through to acceptance under an owner's representation mandate.

Frequently asked questions

What is a BMS tender?

It is the tender file for the building controls package: it describes the work to be supplied, and integrators price it. When it is vendor-neutral, bids become comparable.

Who bids on a controls tender?

Integrators, the companies that supply, programme and commission the controllers and the supervision platform. A vendor-neutral tender leaves them the choice of hardware, as long as the functional requirements are met.

Can a tender stay neutral when a brand is already installed on site?

Yes. The interface with the existing system is described — protocol, objects and naming — rather than a product being imposed. Compatibility with the existing supervision platform is a functional requirement like any other.

Do you work for the building owner or for the HVAC design office?

Both are possible. We work under a direct mandate from the building owner, or alongside the architect and the HVAC design office who wish to entrust the controls package to a specialist.

wall-i SA · rue de l'Industrie 10 · 1950 Sion · hello@wall-i.ch

See also

Further reading

Contact

A controls tender to write or to have reviewed?

Write to us hello@wall-i.ch We get back to you quickly.
Follow on LinkedIn