A successful installation depends on those who wire it, fit it and design it. We train each trade in its share of the control system, with engineers who work on site.
Four building controls courses, given by wall-i in French or German: control wiring for electricians, fitting field devices for ventilation and HVAC installers, choosing devices and protocols for HVAC design offices, running your BMS for operators and building owners. Tailor-made programmes, on your premises or on a real installation.
Electricians — control wiring
- Reading a controls diagram and finding your way around a panel.
- Wiring a fieldbus: topology, shielding, termination.
- Connecting sensors and actuators.
- Labelling cables and devices to KBOB.
- Checks before power-up.
Ventilation and HVAC installers — fitting field devices
- Where and how to mount a duct sensor, an immersion sensor, a pressure switch or a damper actuator.
- Locations and orientation.
- The fitting mistakes that throw the whole control loop off.
HVAC design offices — choosing devices and protocols
- Which signal for which need: analogue or communicating.
- BACnet, Modbus, KNX or M-Bus: what each one is for.
- What must be fixed at design stage so that the points list holds until handover.
Operators and building owners — running your BMS
- Reading a graphic and handling an alarm.
- Setting a schedule or a heating curve.
- Using trend logs.
- The essentials for running the installation without depending on the integrator.
How it works
Every programme is tailor-made: we agree the content, format and duration with you, according to the trade and the level of the participants. Training takes place on your premises or on a real installation — yours, if possible.
The trainers are the firm's engineers, present on projects from preliminary design to commissioning. The terms used are defined in our glossary, and the firm has its own page.
Frequently asked questions
Who is wall-i's building automation training for?
Electricians (control wiring), ventilation and HVAC installers (fitting field devices), HVAC design offices (choosing devices and protocols), and operators and building owners (running the BMS).
Where does the training take place?
On your premises or on a real installation. Format and duration are agreed with you.
In which languages is the training given?
In French or in German: we are bilingual.
Is prior knowledge required?
Every programme is tailor-made, based on the trade and the level of the participants.
wall-i SA · rue de l'Industrie 10 · 1950 Sion · hello@wall-i.ch