(01)The firm

Building automation and BMS engineers in Valais

Head office Sion (VS)Coverage French- and German-speaking SwitzerlandField Controls · BMS

wall-i SA is an independent engineering consultancy based in Sion, Switzerland. Building controls and building management systems (BMS) are our only business. We design, tender and supervise building automation installations, with no ties to any manufacturer or integrator.

In short

wall-i SA, rue de l'Industrie 10, 1950 Sion, Switzerland. Independent building automation engineers working across Valais, French-speaking Switzerland and German-speaking Switzerland, in French and German. Services: owner's representation (BAMO), vendor-neutral control design and tendering, BMS architecture, audits and optimisation, construction supervision, commissioning and training.

What a building automation engineering office does

In a building, heating, ventilation, cooling, lighting and metering are designed by different specialists. Building controls — known in French-speaking Switzerland as MCR — are what make them work together: sensors, valves, actuators, controllers, communication buses and the supervision platform. The controls engineering office defines what the installation must do, describes it in a way that can be verified, puts it out to competition and checks what is delivered.

Without that role, the control system is often covered in a few lines of the HVAC package, and every supplier reads them differently. That finding is what led to wall-i: sound HVAC concepts, but under-specified controls and installations that are hard to operate.

Our services

Our services are set out SIA phase by SIA phase on the home page. We work on new builds and renovations alike.

What sets us apart

Who we are

Tobias Bétrisey, co-founder and administrative director of wall-i SA
Tobias BétriseyCo-founder · Administrative director

Engineer HES in energy and environmental engineering. Over 5 years in building controls, energy and optimisation.

“Advice is only worth something when nothing constrains it.”

Jérôme Savioz, co-founder and technical director of wall-i SA
Jérôme SaviozCo-founder · Technical director

Engineer HES in electrical engineering, infotronics. Over 25 years in building controls, from design to commissioning.

“Interoperability is not declared, it is verified on site.”

On 1 January 2027, wall-i SA takes over the building controls and BMS engineering activity carried out since 2019 within Workswell Sàrl. The reasons for this separation are set out in the founding press release (in French); the company presentation (in French) sums up the firm in a few pages.

Where we work

From Sion, we work throughout Valais, from Monthey to Brig, across French-speaking Switzerland and in German-speaking Switzerland. Projects are run in French or in German.

Frequently asked questions

What does MCR mean?

MCR stands for mesure, commande, régulation (measurement, control and regulation): the sensors, actuators, controllers and programmes that run a building's technical installations. It is the usual term in French-speaking Switzerland; German-speaking Switzerland says MSR, and English speakers usually say building controls or building automation. The BMS (building management system) is the system that supervises and operates all of these installations.

What is the difference between a controls engineering office and an integrator?

The integrator supplies, programmes and commissions the controllers and the supervision platform. The engineering office specifies, tenders and checks, on the building owner's side. wall-i sells neither hardware nor licences and does not bid on the tenders it writes.

When should wall-i be brought in?

As early as possible, ideally at preliminary design (SIA phase 31), when the control concept can still shape the technical choices. We also step in mid-project, to review a tender, bids or a commissioning, and on existing installations, for an audit or an optimisation.

Do you work outside Valais?

Yes. We work mainly across French-speaking Switzerland, from Valais, and also in German-speaking Switzerland. We are bilingual in French and German.

wall-i SA · rue de l'Industrie 10 · 1950 Sion · hello@wall-i.ch

See also

Further reading

Contact

A building automation project in Valais or western Switzerland?

Write to us hello@wall-i.ch We get back to you quickly.
Follow on LinkedIn