The words of building automation, explained in two sentences. To read a tender, follow a site meeting or understand what your integrator is saying.
38 terms
- Actuator
- Motor that positions a valve or a damper on the controller's command. 0–10 V signal, three-point or bus communication.
- As-built documentation
- Documentation handed over at acceptance: as-built diagrams, points lists, functional descriptions, test records, program backups.
- BACnetISO 16484-5
- Open, standardised communication protocol for building automation. It describes data as objects (inputs, outputs, setpoints, schedules, alarms) that every manufacturer reads the same way.
- BACnet MS/TPMaster-Slave / Token-Passing
- BACnet over an RS-485 twisted pair, for field devices: zone controllers, VAV boxes, drives. Modest speed, sensitive to topology and termination.
- BACnet object
- Unit of BACnet data: an analogue input, a binary output, a setpoint, a schedule. Each object carries standard properties, including its name, description and unit.
- BACnet/IP
- BACnet carried over the IT network (Ethernet, UDP). It links controllers to each other and to the supervisor.
- BACS efficiency classA to D · SIA 386.111
- Level of building automation, from D (not efficient) to A (high performance), defined by SIA 386.111 (SN EN ISO 52120-1). Class C is the reference; the standard gives conventional calculation factors, not guaranteed savings.
Read the article → - BMSBuilding management system · BACS
- System that supervises and controls all the technical installations of a building: heating, ventilation, cooling, lighting, blinds, metering.
- Commissioning
- Phase in which each point and then each function is tested on the real installation, with written records, before acceptance (SIA phase 53).
- ControllerPLC · automation station
- Programmable device that reads the sensors, runs the control functions and drives the actuators of an installation. It must keep controlling on its own if the supervisor fails.
- Data point
- One piece of information exchanged with the installation: a measurement, a status, a command, a setpoint or an alarm. It may be physical (wired) or communicated (over a bus).
- EDEEngineering Data Exchange
- Tabular file, defined by the BACnet Interest Group Europe, in which an integrator delivers the list of all BACnet objects of an installation. It lets you check the points list before commissioning.
Read the article → - Field device
- Everything the controller reads or drives on the installation: sensors, pressure switches, valve and damper actuators, drives, meters.
- Fieldbus
- Communication cable shared by several devices (sensors, actuators, meters) instead of one cable per signal. Examples: BACnet MS/TP, Modbus RTU, KNX, M-Bus.
- Functional descriptionsequence of operation
- Document stating, in words and diagrams, how an installation must behave: operating modes, setpoints, safeties, alarms. Programming and testing are based on it.
- Graphicplant schematic
- Animated on-screen picture of an installation, showing live measurements, statuses and setpoints.
- Heating curve
- Rule that sets the heating flow temperature according to the outdoor temperature. Set too high, it overheats and wastes energy; it is tuned on the real building, not on the calculation.
Read the article → - HVACHeating, ventilation and air conditioning
- The installations that produce and distribute heat, cooling and fresh air.
- KBOBCoordination Conference for Public Sector Construction and Property Services
- Body of Swiss public building owners. Its recommendations on building automation are the basis for data point naming and BACnet requirements in many specifications.
Open the reference → - KNXISO/IEC 14543-3
- Open standard for room automation: lighting, blinds, room control. Devices from different manufacturers are configured with one tool.
- M-BusEN 13757
- Bus for reading heat, water, gas and electricity meters.
- MCRMeasurement, control and regulation
- All the sensors, actuators, controllers and programs that run the technical installations. The term used in French-speaking Switzerland; MSR in German, usually “building controls” in English.
The firm → - ModbusRTU · TCP
- Simple, widespread protocol born in industry. It carries raw values in numbered registers: their meaning has to be documented separately.
- MQTT
- Lightweight publish/subscribe messaging protocol, used to send data up to IT platforms or the cloud.
- Naming conventionpoint addressing
- Rule for writing the address of each point: location, system, device, function. A single convention across a whole estate makes installations readable by everyone.
Open the reference → - OPC UAIEC 62541
- Data exchange standard from industry, secure and vendor-independent, used to connect building services to IT systems.
- Owner's representativeBAMO in French-speaking Switzerland
- Consultant who advises the building owner and defends their interests throughout the project, with no ties to the contractors.
Our service → - Points list
- Table of all the data points of an installation, with their name, type and function. It is the document that sets the scope, and therefore the price, of a controls package.
Read the article → - Scheduletime program · calendar
- Function that starts and stops an installation according to occupancy hours, public holidays and exceptions.
Read the article → - Schematic diagram
- Simplified drawing of an installation, with its hydraulic or air-side components and the location of every sensor and actuator.
- Sensor
- Device that measures a quantity: temperature, pressure, humidity, air quality, flow. Badly placed, it throws the whole control loop off.
- SIA 108
- Regulation of the Swiss Society of Engineers and Architects on the services and fees of building services engineers.
- SIA 112phases 11 to 62
- Model that divides every construction project into six phases, from the definition of objectives to operation, split into sub-phases (31 preliminary design, 41 tender, 53 commissioning…).
See our services by phase → - Supervisoroperator workstation · SCADA
- Software and screens through which the operator sees and runs the installations: graphics, alarms, schedules, trends.
- System integrator
- Company that supplies, programs and commissions the controllers and the supervisor. The engineering office specifies and checks; the integrator delivers.
- Tender documents
- File describing the work to be supplied, on which contractors submit their price. When brand-neutral, it makes bids comparable.
Read the article →
Our service → - Trend log
- Recording of a value over time. Without trends, a fault cannot be understood and a saving cannot be proved.
- VAVVariable air volume
- Flow controller fitted on a duct, which adjusts the air supplied to a zone according to its needs. When communicating, it reports its damper position and allows the duct pressure to be lowered.
Read the article →