Your installation can write the list of everything it contains, by itself. The file has existed since 2004, it fits in a spreadsheet, and almost nobody asks for it.
Ask your integrator for the EDE export of the installation. If it arrives the next day, you will finally know what you bought. If it takes a week, the file did not exist — and it is being written by hand right now.
A file the installation can write on its own
EDE, for Engineering Data Exchange, is a spreadsheet listing every BACnet object in an installation: one row per data point, four sheets in all. There is nothing mysterious about it, and that is exactly what makes it useful.
The BACnet recommendation issued by KBOB — the coordination conference of the construction and property services of Swiss public clients, which includes the Federal Office for Buildings and Logistics, armasuisse and the ETH Domain — places it in a single sentence, in its July 2021 edition: the EDE list “is not defined at standard level, but corresponds to a recommendation published in 2004 by BIG-EU”. And it adds the essential part: these lists “can be produced by automatically reading the BACnet functionality of a planned BACnet device”.
Automatic reading. That is the whole point.
The points list attached to a tender is a statement of intent: what somebody intends to deliver. The EDE generated from the installation is a survey: what actually exists, under the names actually written into the controllers. Two documents that look alike and are opposite in nature. Comparing one with the other takes half a day and requires no site visit.
Seventeen columns, five of them mandatory
The official template is published by the BACnet Interest Group Europe. Its layout version — the field reads Version_Of_Layout in the file header — is 2.3, dated 16 January 2017. KBOB recommends not going below it: “It is recommended to use at least version 2.3 of the BIG-EU EDE files.”
That template provides seventeen columns. Only five are mandatory.
| Column | Status | What it gives the client |
|---|---|---|
| keyname | mandatory | unique key for the row |
| device obj.-instance | mandatory | which controller the point comes from |
| object-name | mandatory | the name, hence the readability |
| object-type | mandatory | measurement, command, meter… |
| object-instance | mandatory | the number inside the controller |
| description | optional | the plain text of the function |
| present-value-default | optional | the fallback value |
| min-present-value | optional | bottom of the scale |
| max-present-value | optional | top of the scale |
| settable (commandable) | optional | read-only or writable |
| supports COV | optional | reporting on change of value |
| hi-limit | optional | high alarm threshold |
| low-limit | optional | low alarm threshold |
| state-text-reference | optional | the state texts (off / on) |
| unit-code | optional | the physical unit |
| vendor-specific-address | optional | the manufacturer's internal address |
| notification-class | optional | who gets alerted, and how |
The consequence is direct, and it is the one to remember: a perfectly compliant EDE file may contain nothing but numbers. Five columns filled, twelve empty, and the document is valid. It then says neither what the point measures, nor in which unit, nor between which limits, nor whether it is alarmed.
Demanding “an EDE export” is therefore pointless. What works is demanding the optional columns. That is one line in a specification, not a negotiation.
What EDE does not do
Better said straight away, because it is sometimes presented as a universal exchange format, which it is not.
It is not normative. It is an interest group's recommendation, not a chapter of the BACnet standard. Its latest version dates from 2017 and has not moved since.
It is incomplete by design. KBOB is explicit: EDE lists “contain simplified and incomplete information” and “are useful when more complete information is not available”. It is a survey, not documentation.
It describes no logic. Not the programs, not the interlocks, not the schedules, not the curves. It says what exists and what it is called — never what it does. A building entirely described in EDE is still a building whose control strategy is unknown.
It holds no values. It is not a historian, and it does not replace a data export.
Finally, the template itself carries its authors' warning: the EDE file “was never intended to provide a machine-to-machine data-exchange format” — and it is used for exactly that everywhere. In other words: it works, but it promised nothing.
Three moments where it changes something
At tender stage, it turns an appendix into a template. Instead of describing the points list in prose, the client issues it in EDE format, with the columns it requires filled in. Bids come back comparable, row by row, with nothing left to interpretation.
At integration, it avoids re-keying. Common head-end systems import an EDE file to create their points. On an installation of a few thousand objects, the difference between an import and manual entry is not up for discussion — and what is imported contains no typing errors.
At handover, it becomes the only document that can be checked against another. You read back the EDE exported from the installation and compare it with the one from the tender: missing points show up, added points too, and so do non-compliant names. That check is mechanical. No other document in the BMS file allows it.
That is where the real time saving sits. Not in the file itself, but in the back-and-forth it removes between commissioning and the first year of operation.
The gap EDE does not fill: the names
An unpleasant detail, better known before signature than after.
The KBOB recommendation explicitly excludes from its scope “the designation of data points and the numbering concept”. And its chapter on object names says it plainly: “No rule is prescribed for assigning object names.”
In other words: the Swiss reference recommendation organises the protocol, the device profiles and the string lengths — Object_Name at 64 characters minimum, Description at 128 for a management and operating unit, UTF-8 character set mandatory — but it deliberately leaves the choice of names to the project.
If the client does not impose its own naming convention, every integrator will apply its own. The building will then speak two or three languages, with a faultless EDE file documenting all three.
The template leaves them optional. They are nonetheless what separates a file from documentation:
description · present-value-default · min-present-value · max-present-value · settable · supports COV · hi-limit · low-limit · state-text-reference · unit-code
Three further rules have to be written in, because the template does not cover them: texts in the language of the operator, a description field that accepts at least 128 characters, and instance numbers that stay the same from one version of the file to the next — new objects are appended at the end of the sheet, existing ones are never renumbered. That last one is the most useful of all: without it, comparing two versions of the same file means nothing.
Institutional clients devote seventeen-page directives to this. A private client does not need that: the clause below achieves the same result.
The seven checks to run on an EDE file you receive
- All four sheets are present: EDE, State-Texts, Unit-Texts, Object-Types. A single sheet delivered is a truncated file.
- The header is filled in: project name, version of the reference file, date and author of the last change, and Version_Of_Layout at 2.3 or above.
- The optional columns required by contract are actually filled in — not merely present. An empty column across 4,000 rows is spotted in a second in a spreadsheet.
- Every referenced unit and state text exists: every unit-code used in the EDE sheet appears in Unit-Texts, and every state-text-reference in State-Texts. Otherwise the import into the head-end will produce points with no unit and no text.
- Object names follow the client's naming convention, throughout, with no exception tolerated “for the subcontractor's few points”.
- Descriptions are written out, beyond the abbreviation stage. That is the text the operator will read for twenty years.
- The number of rows matches the contractual points list. Any discrepancy, either way, is justified in writing.
“The contractor shall supply, at commissioning and upon every subsequent modification, the complete EDE file of the installation to the BIG-EU template, layout version 2.3 or above, comprising the four sheets EDE, State-Texts, Unit-Texts and Object-Types. In addition to the template's mandatory fields, the columns description, min-present-value, max-present-value, settable, supports COV, hi-limit, low-limit, state-text-reference, unit-code and notification-class shall be filled in. Object names shall follow the client's naming convention and instance numbers shall remain stable from one version of the file to the next.”
What we do before the checking starts
A checker is worth nothing without a rule to enforce. So that is where we start: we write our clients' own data point naming directive, based on the KBOB BACnet recommendation — precisely where it stops.
It is not a template copied from one project to the next. A client owning forty buildings already has thirty-eight of them named, often in three different ways, and its operator has been working with its own markings for fifteen years. A naming convention that required renaming everything retroactively will never be applied: it will end up as an appendix nobody opens. The directive is therefore built on the existing estate — what is already in place, what can be carried over, what is left behind, and what applies to new installations only.
Once written, we make it hold, and that is where the real work lies:
- we build the tools that check it — the EDE checker below is one of them;
- we advise the client on what its choices commit it to, before they end up in a tender;
- we support the integrator during the project, so that what is delivered matches what was written — the point is not to catch an integrator out at handover, it is that it has no reason to be caught out.
The seven checks above are done by hand in a spreadsheet. That is workable over two hundred rows and painful over four thousand. So we wrote the tool that runs them in one pass.
You drop in the integrator's file, pick the device profile, and it checks in a single pass the character set, the length of descriptions, the object types allowed for that profile, the notification classes, the presence of referenced units and state texts, and whether every object name conforms to the expected designation. It outputs the list of deviations, row by row, exportable as CSV — the document to attach to a handover report.
The check runs against the project's directive — the client's where it has one, ours otherwise — and against the device profiles of the KBOB BACnet recommendation.
The file never leaves the browser: the whole check runs on your own machine, nothing is sent to a server. A points list is a project document, and it has no business travelling.
The tool is not public. We make it available to the clients, architects and HVAC consultants we work with, for the duration of a project. If you have an EDE file on your hands and no idea where to start, write to us: it is usually a matter of one exchange.
An EDE file does not prove that an installation is well built. It only proves what it contains, and under which names. That already makes it the only document in the BMS file whose accuracy can be verified without leaving your desk — provided you asked for it before commissioning, and with the right columns.
wall-i is an independent MCR and BMS engineering practice based in Valais, Switzerland. We write our clients' naming directives and the tools that enforce them. A topic you would like us to cover: hello@wall-i.ch