A Tuesday, around eleven at night. The building has been empty for five hours. And it is still using a considerable share of what it used at three in the afternoon, when two hundred people were working in it. Nobody asked for this. Nobody complains about it either, and that is precisely the problem.
An empty building is not a building at rest. It keeps ventilating deserted rooms, lighting corridors nobody walks through, running pumps that move hot water to radiators nobody looks at.
None of this is a fault. Everything works exactly as it was asked to. Someone simply forgot to ask for it to stop.
There is a word for it
Swiss engineers named it some fifteen years ago. They called it Betrieb ohne Nutzen — operation without benefit — in a study carried out for the Swiss Federal Office of Energy, and gave it an unusually clear definition: a device that runs and delivers a service, even a partial one, from which nobody benefits.
The same study adds the sentence that sums up the whole subject: removing that kind of operation harms nobody, and is not even noticed.
That is what sets it apart from every other energy saving. Lower a heating setpoint, and people feel it. Reduce lighting, and they see it. Switch off a fan on an empty floor at two in the morning, and nobody will ever experience it.
What gets measured
The researchers recorded the electrical load curves of several Swiss service buildings. The result: at night, these buildings were still drawing between 15 and 50 % of their average daytime power. Only one complex exceeded half. Two buildings in Thun — a hotel-restaurant and an office building with a bank — were running at about 45 % of their daytime power through the night.
Two caveats, because they matter. First, these measurements date from 2007 and 2008: lighting has changed, and so has IT. Second, the authors themselves write that their sample is not representative and that these case studies cannot be generalised. So we do not quote them as a Swiss average. We quote them for what they are: real buildings, measured, where this is what was found.
And above all we quote them because the mechanism has not aged a day.
The case that shows everything
A Zurich university building of 32,230 m², housing teaching, offices and a museum. Its night-time base load: 120 kW. While nobody is working in it.
The authors did the only thing that tells you where it comes from: they went there at night, in May 2008, and walked round. In a single visit, they identified the source of 96 % of those 120 kW. Then they quantified what could be removed without affecting operation: 36.5 % of the identified load. More than a third, with no investment and no inconvenience to anyone.
| Use | Measured share |
|---|---|
| Lighting and sockets | 47 % |
| Ventilation | 32 % |
| Auxiliaries (pumps, circuits) | 14 % |
| Not identified | 4 % |
| Heating | 2 % |
| Cooling | 1 % |
Why nobody sees it
Because there is nothing to see.
An electricity bill is monthly: it adds nights and days together and never separates them. A heating statement is annual. A supervisor shows real-time states, and at three in the morning all those states are green — a fan running for nothing is not in fault, it is doing exactly what it was told.
To notice it, you would need either sub-metering by use with a load curve that someone actually looks at, or someone walking through the building at eleven at night. In the vast majority of the buildings we take over, there is neither.
There is a more human reason too: nobody is upset. A building that is too cold generates calls; a building that ventilates all night generates none. Things that make no noise wait a long time.
And what about heating?
It is the first thing people think of when night comes up, and often the only setting an owner knows about their installation: night setback. It deserves a closer look, because intuition gets it wrong twice.
First on weight. In the building measured above, heating accounted for 2 % of the night-time consumption recorded — but that record covered electricity, and heating is counted on another meter. Both subjects are real; they are simply not the same one, and the electrical potential at night is the more overlooked of the two.
Second on what seems obvious. In November 2021 SwissEnergy published an optimisation sheet devoted precisely to this measure, and it sets an entry condition that surprises many people: the building should be poorly insulated and have a heat generator with spare capacity. The same sheet states that the measure makes little sense in new, very well insulated buildings, and that with a heat pump feeding underfloor heating, raising the flow temperature again early in the morning degrades efficiency to the point of possibly cancelling the savings.
In other words: night setback is excellent in a 1960s building heated with oil, and debatable in a recent Minergie building on a ground-source heat pump. It is not a matter of opinion, it is a matter of building type — and the question to ask is not “do we have a night setback?” but “are we in the case where it does anything?”.
Where it does help, the same sheet gives the rules of use: lower by two degrees at most at each step, observe for at least three days before going further, start one to three hours before the end of occupancy, and raise again one to one and a half hours beforehand for radiators, two to three hours for underfloor heating. And a limit not to cross: do not drop below 16 °C at night in a room whose daytime setpoint is 20 °C, or damp patches and mould will appear. The schedules themselves, and the calendars behind them, are the subject of our article on schedules and calendars.
The same sheet suggests a check anyone can do, needing nothing more than a thermometer.
On an evening when it is around 0 °C outside, note a room's temperature at 5 pm. Switch the heating off for the night. Note it again at 7 am the next morning.
If the room has lost more than 3 °C, night setback is worth working on: the building loses heat fast enough for there to be something to gain. If it has barely moved, do not bother — the envelope is already doing the job, and the energy you are looking for is elsewhere, in the fans and the lighting.
Frost protection, finally, is not a saving: it is a safeguard. It exists to stop a pipe freezing in a room that is not heated — a garage, an unheated stairwell, a bike store — and that is what it should be kept for. The two faults we come across are mirror images: the room left on frost protection although its use has changed, discovered the day someone complains; and the “frost protection” raised over the years to twelve or fifteen degrees, which protects no better and heats a volume nobody uses.
Valais law gives one benchmark, and only one: the cantonal energy ordinance allows electric resistance heaters used for frost protection provided they are set to a maximum of +5 °C. That rule was written for a specific case — electric heating of a gutter or a pumping station — and is not a general setpoint for frost-protection mode; but it says clearly enough what order of magnitude frost protection sits at. None of the other documents we consulted sets one. All the more reason to go and read the value set in your building, and to write it down somewhere.
What gets decided long before operation
This is the point that matters to the architect, and it is rarely made.
To switch off part of a building, that part has to exist. If the lighting of a floor is on a single circuit, it is all on or all off — and since one person is working late at the end of the corridor, it is all on. If the ventilation serves five floors from a single system with no zone control, the floor holding a meeting until ten at night imposes its schedule on the other four. If no meter separates the uses, nobody will ever know which one is the problem.
These three decisions — how the lighting is split, how the ventilation is zoned, how many meters there are and where — are taken very early, cost almost nothing at the time, and become irreversible the day the building is handed over. They almost never come up in a design competition.
A building that cannot be switched off in pieces will stay on as a whole.
What the standards require, and what they do not
The Swiss ventilation standard in force, SIA 382/1:2025 — which has replaced the 2014 edition since 1 February 2025 — does more than size airflows. It defines control categories, from the most basic to the finest: single-speed time control, two-speed control per zone based on occupancy, continuous control based on the number of people, control by gas sensors. In variable mode it requires airflow and running time to match demand. And its chapter 7 covers operation, energy monitoring and operational optimisation.
In other words: the subject is in the standard. What the standard does not do is name the person who, on your project, will check a year after commissioning that those schedules still match real occupancy. That person has to be ordered and budgeted — we devoted a whole article to it last week: a new building is not a tuned building.
In Valais, it is no longer good practice: it is the law
This is the point almost nobody knows, and it is worth reading in full. The cantonal energy ordinance, in force since 1 January 2025, contains articles that deal with exactly what this article is about.
Night lighting of non-residential buildings — façades, outdoor areas, and interior lighting visible from outside in shops, offices, public establishments, businesses and warehouses — must be switched off between midnight and 6 am once the activity concerned has ended. The same rule applies to illuminated signs, with a one-hour delay after the activity stops when it continues past midnight. The exceptions are named: safety function or emergency service, hospitals, on-duty pharmacies, fire brigade, police, and eminently touristic places.
So it is not a matter of opinion or goodwill. For a commercial building in Valais, a façade lit at two in the morning after the activity has ended is not an operating oversight: it is non-compliance.
The ordinance goes further, and touches precisely the points raised above:
- ventilation systems serving rooms with significantly different uses or operating periods must be equipped to allow differentiated operation. The zoning we mentioned above is not a comfort option: it is required;
- a new heat or cooling generator must be fitted with metering that allows the operator to keep energy accounts based on periodic readings, and a new centralised mechanical ventilation system must likewise have its own electricity meter. The meter that would tell you what your fans use at night is, in a recent installation, mandatory — and it only helps if it appears in the points list;
- domestic hot water distribution may only be kept at temperature by a self-regulating trace heater controlled by a timer, or a circulation pump controlled by a timer and a thermostat;
- every heated room must be individually and automatically controllable;
- in buildings where occupancy units are used intermittently, at least two temperature levels must be remotely settable per occupancy unit;
- and installations must be commissioned and tuned according to good practice, with an operating file handed to the building owner at final acceptance.
Taken together, these requirements describe a building that can switch itself off in pieces and that measures itself. What they do not say is who checks, a year later, that the schedules set at commissioning still match real occupancy. The canton is in fact preparing an “operational optimisation” certificate: it is announced as under development, and does not exist yet.
The eleven o'clock visit
This is the method used by the Swiss Federal Office of Energy's researchers, and it needs no improvement. It takes two hours, a torch and nobody else.
- Pick the right evening. A Tuesday or Wednesday, outside holidays, at least five hours after the last occupant has left. Not a Friday: Friday evening looks like a weekend, and the weekend deserves its own visit.
- Start with the main meter. Note the power being drawn at that moment and compare it with an ordinary afternoon. The ratio between the two is your figure. If it is above one third, the rest of the visit is worth it.
- Walk round in the order of the list. Lighting of floors, corridors, stairwells, car parks, shop windows and façades — for those last two, in Valais, a visit after midnight is also a compliance check. Ventilation: stop at each grille and feel whether air is coming out. Plant rooms: listen to the fans and pumps. Technical rooms: note what is warm to the touch.
- Write down what you find, with the time. One line per piece of equipment found running, and the presumed reason. That document, not a memory, is what the discussion with the operator will be based on.
- Sort into three columns. What must run (safety, servers, food refrigeration, archive dehumidification). What could stop with a simple schedule. What needs a change — a circuit to split, a sensor to install, a zone to create.
- Do it again on a Saturday. The weekend is a subject in itself: installations often keep Friday's schedule there, for sixty hours on end.
“A visit of the building during unoccupied hours is carried out at commissioning and again at the first-year operational review, on a weekday evening and on a weekend day. It results in a dated and timed record of the equipment found running, classified as necessary operation, operation removable by scheduling, and operation removable after modification. The operating schedules of the installations are attached to the acceptance minutes and reviewed on that occasion.”
We carry out this visit, and we carry it out at night — which, incidentally, is the only unpleasant part of the job. We then write the schedules and zones into the specification, before the tender, because that is when a separate circuit or an extra ventilation zone costs almost nothing.
We do it on the building owner's side, never on the side of whoever executes: the party that writes a specification cannot be the one that answers the tender it leads to.
A building does not switch itself off, and nobody will ever complain that it stayed on. It is the only expense in your building that you can remove without anyone noticing — provided you go and see, once, what it does when nobody is there.